Showing posts with label OHE. Show all posts
Showing posts with label OHE. Show all posts

Sunday, June 10, 2007

Summer construction (part 1)

The summer is time for USC to work on building improvements. There are currently a number of ones going on around campus.

This one is remodeling of a large part of OHE's fourth floor. The remodeling includes removal of the flooring, ceiling fixtures, and possibly walls.



On June 4 part of OHE was closed for asbestos abatement.